Microsoft Corporation Notice of Construction application


Para asistencia en español: preguntas@ecy.wa.gov


The Microsoft Corporation is planning to construct a new data center at Urban Industrial Way, in East Wenatchee. The facility will include 20 3.0‐megawatt electrical (MWe) generators, powered by a Caterpillar Inc. (CAT) Model C175-16 engine, and one 500-kilowatt electrical (kWe) generator, powered by a CAT Model C15 engine. These 21 generators will provide emergency backup power to the facility.


In addition to the Notice of Construction (NOC) application, Microsoft also submitted a State Environmental Policy Act (SEPA) checklist for review.
Ecology determined this proposal satisfies the requirements of Chapter 173-400 of the Washington Administrative Code. Ecology expects to approve this project, and the public is invited to comment. A public hearing will be held if Ecology determines there is significant public interest.


Documents related to this project are:




This notice was posted on August 24, 2021.


Use this comment form to submit a comment to Ecology. The public may request a public hearing. The request must include a reason for the request and why a public hearing is warranted. If significant public interest exists, Ecology may hold a public hearing.


Contact information is necessary if you want to receive future notices or responses related to this topic.


Contact Information

All fields are optional unless otherwise indicated.

Submitted by Value

First Name

Last Name

Address

City

State

ZIP

Email

Your Comment


Comments on the NOC are due by September 23, 2021. Comments on the SEPA determination of non-significance (DNS) are due by September 7, 2021.


To make a comment, please enter comment(s) in the text area. To submit attachments use the "Upload a file" button below. Then hit "Continue" to review your comments(s).


To submit comments for a group please visit our Commenting Tips webpage.


Next steps: After the comment period ends, we will review and respond to comments, and issue the permits if appropriate. If we decide to hold a public hearing, we will post the event on our public inputs & events listing. We will update those who provide contact information.


Any information (e.g., personal or contact) you provide on this comment form or in an attachment may be publicly disclosed and posted on the Internet.

*Uploading a file is optional*

You may attach up to five 30 MB files to accompany your submission. Allowed formats are pdf, jpg, jpeg, png, txt, gif, doc, docx If you experience technical difficulties submitting your comment please contact the person listed at the bottom of this page.


Thank you for subscribing to the Microsoft Corporation Notice of Construction application mailing list.